2019 Garden Journal
Welcome to Gramma's Quilting Room.
Friday, January 25, 2013
Friday Finish
I'm excited to say that Hawaiian Sunset 1845 is a complete quilt top. I layed it out on my bed and it makes my room so bright. I don't want to fold it up and put it on Mt. ToBeQuilted. But I will.
This was number 2 on my Getting It Done Challenge list for January and it feels great to mark it off the list.
Thanks to my friends that taunted and teased me into starting this quilt. You know who you are.
On The Needles
Yesterday I really, really wanted to cast on a pair of socks.
But I didn't.
Instead I cast on the right side of Ernie's vest
and started the ribbing.
That was after I finished the back!
WootWoot
What this means is that I have spent lots of time knitting.
Lots of time!!
See other fabulous On The Needles post here at Patchwork Times.
Thursday, January 24, 2013
Show Us Your Socks
I love these wool socks.
They are perfect for my cold feet.
It's hard to take a good picture without a dog.
I gave up.
Show us your socks!
Link up at Patchwork Times.
Tuesday, January 22, 2013
Tiny Tuesday-Blocks 20 & 24
Block 20 is called Circular Saw.
Tiny paper pieced arcs.
My applique still need work.
I'm using the galloping horse theory on this one.
Block 24 is called Hour Glass.
So fun to reach into the scrap bin and pull out random pieces.
Monday, January 21, 2013
Design Wall Monday
Today's design wall is a box full of Hawaiian Sunset 1845. I put the box away the end of November and put the project on the Getting It Done Challenge for January. And by gosh, I am going to get it done!!! The 4 patch borders are partially assembled. Once I get started on it, it will go fast. With only 10 days left in the month I need to get to Getting It Done!!!
Check out Judy L's gorgeous design wall and other fabulous design walls here. I love Monday in Blogland. A cup of hot lemon tea with honey and I'm ready to wander.
Saturday, January 19, 2013
Pink, Pink....
Everyday this week I have been sewing a little bit. Not marathon sessions like I normally do. I finally finished my Easy Street blocks and while sewing them together, I've been making cute 6" Churn Dash blocks for my Rainbow Scrap Challenge Row Quilt as my leader/enders.
This is my original EQ7 quilt but I'll probably choose different blocks as the year goes on.
Today I'm linking up with Angela's Scrappy Happy Saturday.
Labels:
EQ7,
leader/ender,
Rainbow Scrap Challenge,
Row Quilt
Friday, January 18, 2013
On The Needles
I started Ernie's vest.
He want's a vest made from alpaca yarn but he has to wait.
I want to make sure this will fit, it's what he wants,
but most important, will he wear it.
This pattern is a freebie from Universal Yarn.
It's an easy design and is knitting up pretty fast.
I finished my scarf and grabbed some yarn to try out Potluck Mittens.
I saw these on someone's blog and cannot remember where. Sorry.
They knit up super fast with size 7 needles and acrylic yarn.
Now I want to find some nice soft yarn and make another pair.
2 more finishes bring my total for Sticks 'n Strings 2013 to 5.
I'm sure that will slow down now that I'm on to big projects.
See other great On the Needle Projects
here at Patchwork Times.
Labels:
finishes,
Knitting,
mittens,
On The Needles,
scarf,
Sticks 'n Strings 2013,
vest
Thursday, January 17, 2013
Show Us Your Socks
The other day Judy L wrote a blog post about her socks. I wrote her a note and told her she should do a link box to show off our socks. And she did it! I cannot wait to see awesome socks. Be sure to read the guidelines before linking up. Be brave, show off your socks.
This pair is hand knit using Opal yarn. This is the second time I've worn them and oh boy are they ever toasty! I love having warm feet.
Link up with Judy L today and Show Us Your Socks.
Tuesday, January 15, 2013
Tiny Tuesday
No Midget Blocks have been completed since Day 2 of the Quiltathon.
But lots of prep work took place today.
Block 21-Snowball Flower is the first applique block I've prepped.
Oiye, there are some humpy bumpies that need to be smoothed out.
Tonight I'll give hand applique another try.
This morning I filled all my clear pocket pages with pattern pages.
I think I am up to block 80.
The remaining pages are in a file folder in the back of the book.
I have several pages kitted up with pattern and fabric.
I found I needed to draw a few more missing designs in EQ7.
I think I am good now.
So now that I'm caught up on a few other commitments,
I can pull a block out to work on whenever I want.
Monday, January 14, 2013
Design Wall Monday
Saturday and Sunday of this past Quiltathon,
I worked on catching up with my Grandmother's Choice Sampler.
I was too far behind and a bit of panic set in.
I'm a happy quilter once again.
This is block 20.
When it's done today, I'll be caught up.
I ran out of bobbin thread and then someone wanted dinner.
I never went back in to the sewing room.
Instead, at 6 pm, I put on my pajamas and with my knitting and my blankie,
I parked myself in the recliner.
I'm going to finish block 20 then I have to attack this.
Ernie's favorite work sweatshirt with a broken zipper.
Ugh.
But needing to stockpile good wife points,
(when did I start to do this??? LOL)
I pulled out the bag full of zippers and I'll find one that will work.
He will be a happy husband.
Check out all the fabulous design walls here at Patchwork Times.
I love Monday in Blogland.
Friday, January 11, 2013
January Quiltathon-Day 2
I was reading Judy L's blog post about her Quiltathon Day and I know exactly what she is saying. My day was full of if it can go wrong it will.
Midget block 18 called New Album turned out pretty cute.
Midget block 22 call Kaleidoscope.
This one was a little tricky with it's partial seams.
I'm happy with it.
Then I made another star block and a couple 4 patches for the Scrap Challenge quilt
I worked on this block for the Grandmother's Choice Sampler.
Oh Boy! That pink thingie, that's my new seam ripper along
side my favorite reversible tweezers.
I'll be taking the block apart and
checking my quarter inch seam allowance.
I cleaned the machine and move my guide.
I should have checked but I didn't.
Hoping for a better day tomorrow.
On and Off The Needles
On the needles is this scarf for me.
Lion Brand Homespun Mixed Berries is the perfect color for my favorite jacket.
Quick, easy, knit every row. 25 stitches on size 11 needles.
Finished is the hat from last week using up the last bits of wool yarn.
I have worn it several times already, it's perfect for that quick trip to the chicken house.
I was going to toss any leftover wool but I made 2 dryers balls instead.
Finished last night was this Scarf Hood.
I think a teen girl will love this.
Personally, I think once it is sewn for the hood, the scarf is too short.
But I'm not a teen girl so what do I know.
So with these 2 finishes, I am at 3 finishes for Sticks 'n Strings 2013.
JoAnn's was having a great yarn sale so I stayed away from the store.
But you can order on line and they did have free shipping. wink, wink
I order 2 skeins of yarn to finish an afghan, yarn for 3 pair of socks (don't judge!) and
circular needles for 2 different projects.
This morning I even found this free vest pattern for Ernie's test vest.
He wants one made from alpaca yarn
but I'm going to use fisherman's wool first to test for fit and his likes and dislikes.
I'm linking up to Patchwork Times On The Needles.
Labels:
finishes,
hats,
On The Needles,
scarf,
Sticks 'n Strings 2013
Thursday, January 10, 2013
January Quiltathon-Day 1
Judy L is hosting another Quiltathon. You can see the dates on the left sidebar of her blog. After not spending much time in the sewing room this week, I really looked forward to this weekend Quiltathon.
I made a list of goals for today.
- sew 16 Easy Street A blocks
- do step 1 for Judy L's BOM
- make 2 Midget blocks
- make 2 Grandmother's Choice blocks
- cut batting for Ultimate Scrap Quilt
Judy L's JAN BOM steps DONE!!
Ernie has been getting up at 0 dark thirty to plow snow for the log truckers so that means he's home just after noon...... Messes with Quiltathon. He has a craving for fish and chips instead of the casserole I took out of the freezer that turned out to really be taco soup instead of spaghetti.....so we'll have soup tomorrow and go to town for fish and chips. I'm hoping to be able to sew after he goes to bed tonight.
Labels:
Back To Square One Mystery,
Easy Street,
goals,
Grandmother's Choice Sampler,
Midget Blocks,
quiltathon
Monday, January 07, 2013
Design Wall Monday
On the first design wall of 2013 is Easy Street. One block A is sewn together. 15 blocks are in parts. Block B parts are waiting their turn. Crud!!! I just noticed my bottom 4 patches are turned wrong! Thank goodness there is only one block complete. I love catching the mistake before it turns into a disaster.
Rows 1 and 2 are sewn together. Row 3 is ready for it's turn. I'll sew all of blocks 1 and 2 together, press them and then add block 3 making sure I have a good scrappy mix for each row. When all the rows are sewn together then they will go up on the wall a row at a time so each block has variety.
I kind of feel like a slacker when seeing so many quilt tops together but I've been pretty busy doing other fun things like playing with my Grands and knitting and laundry and other fun household stuff and Facebook and Pinterest (those 2 time suckers will not get me this week!). You all know what I'm talking about!!
See other fabulous design walls at Patchwork Times. I love Monday in Blogland.
And there are oodles and oodles of Easy Street progress posts linked up to Quiltville. Including this one. :c)
I love all the different color choices.
Saturday, January 05, 2013
Saturday Sewing
Saturday was a busy, busy day! I started out early in the sewing room trying to be quiet. I already had plans to babysit the grands this afternoon. OH BOY! Those 4 cuties can wear a Gramma out! We had a blast.
When we got home, Ernie wanted to watch a movie that I didn't care about so I went in to the sewing room and worked on Easy Street. This last step is taking me a while. I sure am liking it though and can't wait to start the second set of blocks.
I made a couple pink star blocks and some 4 patches for my Rainbow Scrap Challenge. I love this star block so I made 2...the whites were already cut and you can't go wrong with 4 patches. Maybe I'll continue with these blocks and make a super cute baby girl quilt. Visit SoScrappy to see other fabulous pink blocks.
When we got home, Ernie wanted to watch a movie that I didn't care about so I went in to the sewing room and worked on Easy Street. This last step is taking me a while. I sure am liking it though and can't wait to start the second set of blocks.
Labels:
Easy Street,
grand-kids,
Rainbow Scrap Challenge
Friday, January 04, 2013
Meet Miss Elsie Green
Miss Elsie Green, my new/old Elna arrived today. She rode the USPS truck south from Seattle to Portland then to rural Clark County. I bought her through eBay from Seattle Goodwill. I was so excited. The pictures on the listing were a bit deceiving, I thought she would be more of a lime green but really she is more of an olive green. No big deal, just a little disappointing. I know that's the risk you take.
I thought she was boxed up very well. There was a thick layer of bubble wrap on top.
I think this is the only machine I will buy off eBay. I'm not a fan of the unknown. I almost didn't bid on it but it is so unique and I had that oh I want it so bad attitude that I shared with Ernie and he "made" me keep bidding! That's my story......... If we never get her to work, she will be come a piece of art but first she needs her face washed, she a bit grungy.
On The Needles
I'm working on using it up......the bits of yarn left from other projects. This hat is made using leftover wool from this pair of slippers and these gray socks. If there are any bits left over, maybe I'll get brave enough to just drop them in the garbage. Or maybe not.
The Honey Cowl is finished. This is Project 1 for Sticks 'n Strings 2013. I don't have 13 unfinished knitting projects but I have a few. I'm going to do like Denise and finish an already started project before I can start a new one. So the hat is my new project. When that is finished, I have 3 scarves to choose from. Also on my list of 2013 Knitting Projects is a vest for Ernie and a sweater for me. I'd like to get the scarves finished before I tackle either of these. I see a couple new hats being made before the vest, that thing is making me nervous!
See other great On The Needles posts at Patchwork Times.
Labels:
cowl,
hats,
On The Needles,
Sticks 'n Strings 2013
Wednesday, January 02, 2013
From The Quilting Room In 2012
I went back through 2012 to see what I had finished during the year. There were a lot more starts than finishes.
2 embroidery projects turned in to pillows
2 baby quilts
3 wall hangings
4 bed size quilts
4 bags
1 bunch of cute doll clothes for a special little girl
2013 will have me focusing on finishing a few more of my projects, probably starting several more. One thing is for sure, I'll love doing it all.
Tuesday, January 01, 2013
New Year's Day Sewing
They say what you do on New Year's Day will be what you do all year. That mean's besides the everyday living stuff, I will continue to do what I love--torment my husband and sew. He will continue to indulge me. It works out well for both of us.
The top is now complete for Barrister's Block Sow-A-Long. The first finished top for 2013. I had all the border pieces cut and ready to sew on yesterday but instead spent the evening watching TV with Ernie and knitting.
Next on today's agenda is part 7 of Easy Street. Oh, Miss Betty Blue, she sews like a dream. I just have to remember that with no automatic needle up, she will come un-threaded if the take up arm is not up.
I'll be back later with more to report.
It's 5 pm and I'm tired. It's time to put Miss Betty Blue to bed.
I've spent most of the afternoon working on part 7 of Easy Street.
The top is now complete for Barrister's Block Sow-A-Long. The first finished top for 2013. I had all the border pieces cut and ready to sew on yesterday but instead spent the evening watching TV with Ernie and knitting.
Next on today's agenda is part 7 of Easy Street. Oh, Miss Betty Blue, she sews like a dream. I just have to remember that with no automatic needle up, she will come un-threaded if the take up arm is not up.
I'll be back later with more to report.
It's 5 pm and I'm tired. It's time to put Miss Betty Blue to bed.
I've spent most of the afternoon working on part 7 of Easy Street.
The corner triangles just need trimmed.
The big triangles are all layed out for easy piecing.
The top section is ready to sew to the 3 block section.
Have I said how much I love these colors?!?!
Here's hoping 2013 is good to all of us.
Happy Tiny Tuesday New Year--Blocks 17 & 19
Happy New Year
Subscribe to:
Posts (Atom)
